[ REPORT ] Commercial Building Structural Design and Analysis



here are the some of the reports related to the civil egineering .Download them and increase your knowledge,
  1. [ report ] Improving construction Productivity
  2. [ REPORT ] Residental green building report
  3. Construction Project Controls: Cost, Schedule, and Change Management
  4.   [ REPORT ] Commercial Building Structural Design and Analysis  
  5.  [ REPORT ] CONSTRUCTION PROJECT MANAGEMENT
  6.   [ E-book ] Construction cost management
  7. [report ]PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDIN


[ REPORT ] Commercial Building Structural Design and Analysis
Abstract
The purpose of this Major Qualifying Project was to analyze and design a struc turalsystem for an illustrative commercial building in Worcester, Massachusetts. The design process included an architectural layout, structural framing options using both steel and concrete, a dome roof, and a partial glass curtain wall.
The work was c ompleted in compliance with the IBC and local building codes.
Several structural materials and strategies were evaluated to produce a final, cost effective, design recommendation, which was presented in Revit Models


DOWNLOAD FUL REPORT HERE
 [ REPORT ] Commercial Building Structural Design and Analysis
if u like the post just say thank u in comment box.

[ REPORT ] CONSTRUCTION PROJECT MANAGEMENT

 Here are the report for the civil engineering ..if you want to know about them download them
  1. [ report ] Improving construction Productivity
  2. [ REPORT ] Residental green building report
  3. Construction Project Controls: Cost, Schedule, and Change Management
  4.   [ REPORT ] Commercial Building Structural Design and Analysis  
  5.  [ REPORT ] CONSTRUCTION PROJECT MANAGEMENT
  6.   [ E-book ] Construction cost management
  7. [report ]PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDIN





 [ REPORT ] CONSTRUCTION PROJECT MANAGEMENT

 This project is abou the construction project of a big schoool

The following repo rt contains information and analyses related to HD Woodson Senior High School
located in Washington, DC. The initial sections contain background information and data pertaining to
the project, followed by four analyses created to theoretically study the Constructability, Schedule
Acceleration and Value Engineering of a construction project. The framework for this report is created
by the Architectural Engineering Senior Capstone Thesis course sequence.
Analysis One: Maximizing BIM Investment
The use of Building Information Modeling, BIM, on HD Woodson High School was an effective way to
facilitate trade coordination.
Using BIM assisted in coordinatingthe large amount of MEP systems in areas confined by low floor to structure heights and the desire to eliminate fie
l d clashes of these components. While this decision was one great way to coordinate MEP Systems there are many uses that can mak BIM efforts more beneficial
. Building Information Modeling can be much more than a
3Dclash detecting model if the goals and uses are defined early on in a project. This critical industry issue of high initial costs associated with BIM can be justified if the end results and valuable inputs ofBuilding Information Mode
lingare maximized. This topic was aCritical Industry discussion at the PACE Roundtables.
Analysis Two: Optimizing Value Engineering
Analysistwo looks at some possible Value Engineering (VE) Solutions to clear the hurdle of “LEED” elements being excluded from the VE Process. The green roof will be at the center of t his analysis and investigation i nto the impacts of the green roof on other building systems. Value Engineering that dismisses LEED elements can unknowingly overlook cost effective benefits that can add real value and
reduce total project costs and schedule. Analysis Three: Alternative Exterior Wall Assemblies Exterior enclosure is a major schedule risk to the projects timely completion. The current design for the exterior walls is exterior masonry panels with CMU backing. Issues that come from use of a CMU wall are its duration, weather impacts, cleanliness and ability for changes and acceleration during MEP rough in. Analysis three will develop and evaluate two alternate assemblies. The path to this topic began with a site visit, during which the masons were laying block and having to lift the blocks over the conduits stubbed up out of the walls. Analysis Four: Alternative Steel Truss Construction The transportation of steel trusses, for the gymnasium at HD Woodson High School, becameextremely challenging. Multiple trusses over 100 feet long had to be transported from Delmar Delaware to NE Washington DC, roughly 112 miles, with police escorts and at great stress and expense to the project team. This topic was derived from a conversation with the project team about the truss transportation.
 Download full report
[ REPORT ] CONSTRUCTION PROJECT MANAGEMENT
if u like the post just say thank u in comment box.

PROJECT [ REPORT ] ON DESIGN OF A RESIDENTIAL BUILDING

  1. [ report ] Improving construction Productivity

  2. [ REPORT ] Residental green building report

  3. Construction Project Controls: Cost, Schedule, and Change Management

  4.   [ REPORT ] Commercial Building Structural Design and Analysis  

  5.  [ REPORT ] CONSTRUCTION PROJECT MANAGEMENT

  6.   [ E-book ] Construction cost management

  7. [report ]PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDIN



  PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING

INTRODUCTION
The basics needs of human existences are food, clothing’s & shelter. From times immemorial man has been making efforts in improving their standard of living. The point of his efforts has been to provide an economic and efficient shelter. The possession of shelter besides being a basic, used, gives a feeling of security, responsibility and shown the social status of man. Every human being has an inherent liking for a peaceful environment needed for his pleasant living, this object is achieved by having a place of living situated at the safe and convenient location, such a place for comfortable and pleasant living requires considered and
kept in view.
•A Peaceful environment.
•Safety from all natural source & climate conditions
•General facilities for community of his residential area.The engineer has to keep in mind the municipal conditions, building bye laws,environment, financial capacity, water supply, sewage arrangement, provision of future, aeration,ventilation etc., in suggestion a particular type of plan to any client

Download full report 
 PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
if u like the post just say thank u in comment box.